6 Cell Sub-C Straight 1800mAh 7.2V Long Lead
$30.10
Exit Sign and Emergency Lighting Battery Pack
Description
This Emergency Lighting Battery pack is manufactured using high temperature cells specifically designed for constant charge use in emergency lighting applications.
Dependable Backup Power for Emergency Lighting.
This Exit Sign Battery pack is known to have an incredible service life and is one of the most rugged batteries that works well under demanding environments. This makes it a great choice to be used in emergency lighting applications because it can tolerate continuous charging and harsh temperatures.
Tired of wondering when the power will go out? Get reliable emergency light batteries from our online store.
Don’t get stuck in the dark! Call 0411537459
Additional information
| Bracket | No, Yes |
|---|---|
| Plug | Clev 1, Stan 1, Stan 2 |
| Chemistry | Ni-Cad |
| mAh | 1800 |
| Size | 6 Cell Sub C |
| Voltage | 7.2 |
You must be logged in to post a review.
Related products
-

7 Cell Sub-C Curved 1800mAh 8.4V
0 out of 5$40.90 Select options This product has multiple variants. The options may be chosen on the product page -

5 Cell Sub-C Straight 1800mAh 6.0V
0 out of 5$25.00 Select options This product has multiple variants. The options may be chosen on the product page -

6 Cell Sub-C Straight 1800mAh 7.2V
0 out of 5$29.80 Select options This product has multiple variants. The options may be chosen on the product page -

6 Cell Sub-C Squat 1800mAh 7.2V
0 out of 5$29.80 Select options This product has multiple variants. The options may be chosen on the product page





Reviews
There are no reviews yet.