5 Cell D Straight 4000mAh 6.0V Long Lead
$46.30
Exit Sign and Emergency Lighting Battery Pack
SKU: 0016 Category: Ni-Cad D Batteries
Description
This Emergency Lighting Battery pack is manufactured using high temperature cells specifically designed for constant charge use in emergency lighting applications.
This Exit Sign Battery pack is known to have an incredible service life and is one of the most rugged batteries that works well under demanding environments. This makes it a great choice to be used in emergency lighting applications because it can tolerate continuous charging and harsh temperatures.
Tired of wondering when the power will go out? Get reliable emergency light batteries from our online store.
Don’t get stuck in the dark! Call 0411537459
.
Additional information
| Bracket | No, Yes |
|---|---|
| Plug | Clev 1, Stan 1 |
| Size | 5 Cell D |
| mAh | 4000 |
| Voltage | 6.0 |
| Chemistry | Ni-Cad |
Be the first to review “5 Cell D Straight 4000mAh 6.0V Long Lead” Cancel reply
This site uses User Verification plugin to reduce spam. See how your comment data is processed.You must be logged in to post a review.
Related products
-

2 Cell D Squat 4000mAh 2.4V
0 out of 5$18.60 Select options This product has multiple variants. The options may be chosen on the product page -

6 Cell D Straight 4000mAh 7.2V
0 out of 5$47.50 Select options This product has multiple variants. The options may be chosen on the product page -

4 Cell D Squat 4000mAh 4.8V
0 out of 5$36.20 Select options This product has multiple variants. The options may be chosen on the product page -

4 Cell D Straight 4000mAh 4.8V
0 out of 5$36.20 Select options This product has multiple variants. The options may be chosen on the product page





Reviews
There are no reviews yet.